Projects

Overseas Projects

  • Singapore MRT 2nd Leaky Cable System

    Timescale: December 2008 – December 2011

    Design, installation supervision, test supervision of an integrated mobile telecommunication network for 3G and 2G in Singapore SMRT north south line and east west line. This is a 2-leaky cable system installed inside the 40 km tunnels and 18 stations.

  • Singapore KPE Tunnels Mobile Telecom System

    Timescale: August 2002 – December 2008 + warranty

    Design, installation supervision, test supervision and warranty support of the Mobile Telecom System for Kallang Expressway and Paya Lebar Expressway Tunnels. The system provides cellular coverage of GSM900, DCS1800 and UMTS for vehicular tunnels and optional ventilation buildings under 4 civil car tunnel contracts up to a total length of 10km.

  • Bangkok MRT Blue Line Integrated Radio Distribution Network

    Timescale: February 2005 - March 2008

    Design, installation supervision, test and commissioning of the Bangkok MRT Blue Line Integrated Network. The project also includes the provision of CDMA800 and GSM900/1800/1900 coverage in Bangkok MRT Line stations. The system provides coverage for 18 stations together with tunnel tubes.

  • Guangzhou Metro Line 2 - Commercial Radio System

    Timescale: May 2002 - March 2003

    Supply and design support of the 2-leaky cable system for Guangzhou Metro Line 2 covering GSM, CDMA and future DCS1800 and UMTS services for 16 underground stations and tunnels.

HW